Kyiv fitness center. Health sport complex Boryspil
Parametric architecture of sport center in Boryspol near Kyiv. Algorithms of panelling and tessellation were written to achieve individual patterns of facades.
Fitness club is situated on active highway between capital of Ukraine and main national airport. Center is integrated into business-park structure with area of 220 000 m2 as well as administration buildings, educational center structures, hotel and office buildings. Business park workers and guests have ability to feel good visiting swimming pool, saunas, spa, gym and cardio section, group sections and universal playground of gaming sports.
LOCATION: Boryspil, Kyiv region, Ukraine
AREA: 4,500 m2
DATE: 2009 – 2010
PROGRAM: Sport Health Center in Business Park
CLIENT: KNUCA
ARCHITECT: Dmytro Aranchii Architects
PROJECT TEAM: Dmytro Aranchii, Viacheslav Kyrpach
CONSULTANT: Hanna Yablonska
GENERAL CONCEPT
Fitness center is located on the center of building area, connecting different functions of business park and being the point of attraction and relaxation for people. Building is a little bended on a plan, because of the yard plan geometry.
The volume of building has a linear composition, a shape of a whole and partitions of facades and roof panels, that give an opportunity to distinguish 3 main blocks (entrance, swimming pool with gym and sport games playground). Plastic of the building includes such important elements as fold and transformation. Like BMW construction innovations, building has surfaces, where fold appears from ideal smooth plane and disappears suddenly. Besides there is an approach applied where a horizontal plane transforms into a vertical one creating a fold and eliminates merging with next surface.
ALGORITHMIC / PARAMETRIC METHODS OF MORPHOGENESIS
During a design process were written program codes (scripts in vb script programming language for Rhino) that allow sharp scaling of facade panels in 3d space and some scripts where adapted for individual case to work with attractors (windows scaling according to sun insolation needed).
There was a cross-ribbed system designed for the roof of the fitness center to block passage of 26 meters long.
Faćades’tesselations
Digital panelling of sport center’s surfaces
Parametric scaling of windows due to attractor (insolation) activity
Fitness club (gym) interior with roof algorithmic structure
Swimming pool zone
Sport center architecture from above
Windows of the roof change according scale factor
Sport center architectural project’s layout
Construction of the building’s roof
Section
Ground floor
First floor
Share this page:
|
|
Tweet |